10 Station Road is a new office block located in the heart of Cambridge, designed and constructed with sustainability as a core principle.
Read the case studyWe are working with Powell Dobson and Natural Resources Wales on their mission to decarbonise all of their offices across Wales, starting with the Timber Forestry Commission Office.
Read the case studyThis project consists of a mixed-use development in Wimbledon, London. The proposal includes 135 new homes with ground floor retail spaces.
Read the case studyNo.1 Friary Temple Quay is a fantastic new office development directly adjacent to Bristol Temple Meads Train Station in heart of the city.
Read the case study1210 Arlington Business Park is a major refurbishment and extension of a 4,500m2 office building in Reading.
Read the case studyThe project consists of the new construction office buildings in Temple Way, Bristol.
Read the case studyProject Norwood is a new 100,000 sq foot office block over 6 floor for the insurance company Zurich in Swindon.
Read the case studyThe £7.9 million indoor sports complex, delivered by Speller Metcalfe, has replaced the former sports dome and occupies the same footprint.
Read the case studyThe University of Glasgow is set to construct the Keystone Building, a major new learning, teaching, and research facility with the aim of it becoming one of the largest net-zero-carbon University buildings in the UK.
Read the case studyThe first ever Passivhaus Secondary School in the UK. Sutton Council aim was for a school with minimal operational carbon, certainty of energy savings and an excellent indoor environment.
Read the case studyThe project consists of the construction of a new boarding house at Sevenoaks School Foundation.
Read the case studyThis project consists of a refurbishment of two existing buildings alongside a new-build construction to create a new Junior and Lower School with an aspiration to be net zero carbon in both construction and operational energy.
Read the case studyThe project consists in the construction of a new Institute of Medical Sciences (IMS) to train 3,000 students a year.
Read the case studyThe University Learning Hub is designed to be low carbon providing a highly sustainable environment for work, study and collaboration.
Read the case studySustainable Construction Services played a crucial role in the Department of Biological Science project at the University of Bristol, working with the team for over five years to achieve a BREEAM Excellent rating for the new building.
Read the case studySCS's work on HMP Maidstone included supporting the successful delivery of a new sports hall located within an operational category C prison.
Read the case studyThe development for the London Borough of Lambeth provided a new 900 place secondary school in Streatham Vale, London, creating a rich and vibrant learning environment for both students and staff.
Read the case studyThis project consists of a two storey building that provides practical plumbing and electrical work, plus flexible build spaces, testing areas, mobile workbenches, breakout and show case areas, and associated classrooms, offices and storage spaces.
Read the case studySCS were appointed by Cirencester College as the Sustainable Consultant to join the team at early stages.
Read the case studyAlconbury Weald Church Academy project compromise the construction of a new SEND School and a Secondary School in Huntingdon.
Read the case studyThe legendary Brabazon Hangars will be transformed into the largest arena and exhibition centre in the region.
Read the case studyWe are working with Powell Dobson and Natural Resources Wales on their mission to decarbonise all of their offices across Wales, starting with the Timber Forestry Commission Office.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studyThe project involves the construction of a single storey Church including an auditorium, café, kitchen, and function rooms.
Read the case studyFor security reasons, we cannot publish specific details about our work with the Ministry of Justice. However, we can confirm that we have provided support on a range of projects including secure facilities, training facilities, recreational facilities.
Read the case studyThe project consists of a new residential mixed-use development comprising 5 new construction buildings to provide 654 new homes
Read the case studyThis project consists of a mixed-use development in Wimbledon, London. The proposal includes 135 new homes with ground floor retail spaces.
Read the case studyThe University Learning Hub is designed to be low carbon providing a highly sustainable environment for work, study and collaboration.
Read the case studyThe refurbishment of a Grade II Listed building on Porchester.
Read the case studySCS have been involved in the design an construction of two Guide Dogs facilities. One is located in Redbridge and the other one is in Tollgate.
Read the case studyThe project involves a new water park for Chessington World of Adventures Resort.
Read the case study1210 Arlington Business Park is a major refurbishment and extension of a 4,500m2 office building in Reading.
Read the case studyThis project involved the construction of two single storey buildings: a Community Centre and Sport Pavilion in Boorley Green, Hampshire.
Read the case studyThis project consisted in a new storage unit in Weston Super Mare. This development has a number of highly sustainable features within the design that contributes to the overall performance of the building.
Read the case studySCS were appointed by Cirencester College as the Sustainable Consultant to join the team at early stages.
Read the case studyCowlyn Bay Community & Watersport Centre was the initial phase of a development plan aimed at revitalizing the Colwyn Bay seafront
Read the case studyThe mixed-used regeneration scheme features a range of retail, food and commercial uses, apartments and office units linked by a cosmopolitan mix of courtyard spaces.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studySCS's work on the HMP Guys Marsh project extends to both the development of the new T60 houseblock (houseblock 1) and accompanying workshop located within an active Category C prison in Dorset.
Read the case studyFor security reasons, we cannot publish specific details about our work with the Ministry of Justice. However, we can confirm that we have provided support on a range of projects including secure facilities, training facilities, recreational facilities.
Read the case studyThis project was a Green Apple Award Winner in 2012 achieving level 4 for the Code for Sustainable Homes, developed in partnership by Coastal Housing Group and the Welsh Assembly Government.
Read the case studyWe will collaborate with the design team to incorporate strategies that will enable the High Commissioner's Residence building and staff accommodation in Abuja, Nigeria to achieve a BREEAM Excellent rating.
Read the case studyThis was a major new redevelopment project for University Hospital Wales, updating their Major Trauma Vascular Hybrid Theatres funded by the Cardiff and Vale University Health Board.
Read the case studySCS's work on HMP Maidstone included supporting the successful delivery of a new sports hall located within an operational category C prison.
Read the case studyWe are supporting a major 5-10 year refurbishment to provide new facilities in the historic building meeting changing clinical and patient needs.
Read the case studyA major new hospital development including the construction of three new buildings and refurbishment of an existing building.
Read the case studyThis was a major new redevelopment project for University Hospital Wales, updating their Major Trauma Vascular Hybrid Theatres funded by the Cardiff and Vale University Health Board.
Read the case studyCroes Atti Care Home with a total floor area of 4,000 sqm across four stories, will provide ensuite rooms for residents, multiple lounges, dinning rooms and other wellness facilities.
Read the case studyThis new build health facility includes primary care, minor procedures, outpatient and many other health services.
Read the case studySancta Maria Hospital, located in Swansea provides primary healthcare facilities including Inpatient, Outpatients, Day Case Surgery, Radiology, MRI, and support areas.
Read the case studyThe project involves a construction of a new hotel located in Exeter Science Park. The Net Zero Carbon hotel will include 142 bedrooms, restaurant space and bar with private dining, conference facilities and a gym, as well as electric vehicle and electric bike charging points.
Read the case studyThe legendary Brabazon Hangars will be transformed into the largest arena and exhibition centre in the region.
Read the case studySet in the grounds of Warwick Castle, The Merlin Entertainments medieval themed Hotel meets modern standards but keeps to the 1,100 years of Warwick Castle’s authentic history.
Read the case studyThis project consisted of a local services and interior design fit-out. The project is London’s Biggest Craft Beer Venue and BrewDog’s biggest ever UK site in the heart of Sidings at Waterloo Station.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studyThe project involves the construction of a single storey Church including an auditorium, café, kitchen, and function rooms.
Read the case studySpelthorne Borough Councils Leisure Centre, once completed will be the UK’s largest wet and dry leisure centre to achieve Passivhaus, and the first in London.
Read the case studyThe project involved a refurbishment of an existing building to provide 18 rooms, bear lovers bars on the ground floor and rooftop.
Read the case studyThe Other House Covent Garden will provide a signature club flats, rooftop bar, bistro, restaurant, gym and wellness centre in Covent Garden.
Read the case studyWake The Tiger is an immersive art experience consisting of 27 different creative environments including artwork, installations, narrative, soundscape, secret passageways and so much more.
Read the case studySCS have been involved in the design an construction of two Guide Dogs facilities. One is located in Redbridge and the other one is in Tollgate.
Read the case studyThe project involves a new water park for Chessington World of Adventures Resort.
Read the case studyThis project involved the construction of two single storey buildings: a Community Centre and Sport Pavilion in Boorley Green, Hampshire.
Read the case studySCS's work on HMP Maidstone included supporting the successful delivery of a new sports hall located within an operational category C prison.
Read the case studyCowlyn Bay Community & Watersport Centre was the initial phase of a development plan aimed at revitalizing the Colwyn Bay seafront
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studySCS's work on the HMP Guys Marsh project extends to both the development of the new T60 houseblock (houseblock 1) and accompanying workshop located within an active Category C prison in Dorset.
Read the case studySpelthorne Borough Councils Leisure Centre, once completed will be the UK’s largest wet and dry leisure centre to achieve Passivhaus, and the first in London.
Read the case studyFor security reasons, we cannot publish specific details about our work with the Ministry of Justice. However, we can confirm that we have provided support on a range of projects including secure facilities, training facilities, recreational facilities.
Read the case studyThe project consists of a new residential mixed-use development comprising 5 new construction buildings to provide 654 new homes
Read the case studyThis project consists of a mixed-use development in Wimbledon, London. The proposal includes 135 new homes with ground floor retail spaces.
Read the case studyCowlyn Bay Community & Watersport Centre was the initial phase of a development plan aimed at revitalizing the Colwyn Bay seafront
Read the case studyThe mixed-used regeneration scheme features a range of retail, food and commercial uses, apartments and office units linked by a cosmopolitan mix of courtyard spaces.
Read the case studyThe project involves a construction of a new hotel located in Exeter Science Park. The Net Zero Carbon hotel will include 142 bedrooms, restaurant space and bar with private dining, conference facilities and a gym, as well as electric vehicle and electric bike charging points.
Read the case studyWe are working with Powell Dobson and Natural Resources Wales on their mission to decarbonise all of their offices across Wales, starting with the Timber Forestry Commission Office.
Read the case studyThe University of Glasgow is set to construct the Keystone Building, a major new learning, teaching, and research facility with the aim of it becoming one of the largest net-zero-carbon University buildings in the UK.
Read the case studySCS have been appointed by Cardiff Council to be Carbon Consultant to support a new development of 53 new council homes adjacent to St Teilo’s School, Llanedeyrn, Cardiff.
Read the case studyThis project consisted of a local services and interior design fit-out. The project is London’s Biggest Craft Beer Venue and BrewDog’s biggest ever UK site in the heart of Sidings at Waterloo Station.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studyThe first ever Passivhaus Secondary School in the UK. Sutton Council aim was for a school with minimal operational carbon, certainty of energy savings and an excellent indoor environment.
Read the case studySpelthorne Borough Councils Leisure Centre, once completed will be the UK’s largest wet and dry leisure centre to achieve Passivhaus, and the first in London.
Read the case studyFor security reasons, we cannot publish specific details about our work with the Ministry of Justice. However, we can confirm that we have provided support on a range of projects including secure facilities, training facilities, recreational facilities.
Read the case studyA major new hospital development including the construction of three new buildings and refurbishment of an existing building.
Read the case studyThe project consists of the construction of a new boarding house at Sevenoaks School Foundation.
Read the case studyThe project involved a refurbishment of an existing building to provide 18 rooms, bear lovers bars on the ground floor and rooftop.
Read the case studyThe Other House Covent Garden will provide a signature club flats, rooftop bar, bistro, restaurant, gym and wellness centre in Covent Garden.
Read the case studyThe project consists in the construction of a new Institute of Medical Sciences (IMS) to train 3,000 students a year.
Read the case studyThe project consists of a new residential mixed-use development comprising 5 new construction buildings to provide 654 new homes
Read the case studyWake The Tiger is an immersive art experience consisting of 27 different creative environments including artwork, installations, narrative, soundscape, secret passageways and so much more.
Read the case studySCS have been involved in the design an construction of two Guide Dogs facilities. One is located in Redbridge and the other one is in Tollgate.
Read the case study1210 Arlington Business Park is a major refurbishment and extension of a 4,500m2 office building in Reading.
Read the case studyThis project involved the construction of two single storey buildings: a Community Centre and Sport Pavilion in Boorley Green, Hampshire.
Read the case studyThis was a major new redevelopment project for University Hospital Wales, updating their Major Trauma Vascular Hybrid Theatres funded by the Cardiff and Vale University Health Board.
Read the case studyCroes Atti Care Home with a total floor area of 4,000 sqm across four stories, will provide ensuite rooms for residents, multiple lounges, dinning rooms and other wellness facilities.
Read the case studySCS's work on HMP Maidstone included supporting the successful delivery of a new sports hall located within an operational category C prison.
Read the case studyThis new build health facility includes primary care, minor procedures, outpatient and many other health services.
Read the case studyThis project consisted in a new storage unit in Weston Super Mare. This development has a number of highly sustainable features within the design that contributes to the overall performance of the building.
Read the case studyThe development for the London Borough of Lambeth provided a new 900 place secondary school in Streatham Vale, London, creating a rich and vibrant learning environment for both students and staff.
Read the case studyThis project consists of a two storey building that provides practical plumbing and electrical work, plus flexible build spaces, testing areas, mobile workbenches, breakout and show case areas, and associated classrooms, offices and storage spaces.
Read the case studySCS were appointed by Cirencester College as the Sustainable Consultant to join the team at early stages.
Read the case studyAlconbury Weald Church Academy project compromise the construction of a new SEND School and a Secondary School in Huntingdon.
Read the case studySCS have been appointed by Cardiff Council to be Carbon Consultant to support a new development of 53 new council homes adjacent to St Teilo’s School, Llanedeyrn, Cardiff.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studySCS's work on the HMP Guys Marsh project extends to both the development of the new T60 houseblock (houseblock 1) and accompanying workshop located within an active Category C prison in Dorset.
Read the case studyThe project consists of a new residential mixed-use development comprising 5 new construction buildings to provide 654 new homes
Read the case studyThis project consists of a mixed-use development in Wimbledon, London. The proposal includes 135 new homes with ground floor retail spaces.
Read the case studyThe refurbishment of a Grade II Listed building on Porchester.
Read the case studyThis project was a Green Apple Award Winner in 2012 achieving level 4 for the Code for Sustainable Homes, developed in partnership by Coastal Housing Group and the Welsh Assembly Government.
Read the case studyThe mixed-used regeneration scheme features a range of retail, food and commercial uses, apartments and office units linked by a cosmopolitan mix of courtyard spaces.
Read the case studyThis project consisted of a local services and interior design fit-out. The project is London’s Biggest Craft Beer Venue and BrewDog’s biggest ever UK site in the heart of Sidings at Waterloo Station.
Read the case studyThis project consisted in a new storage unit in Weston Super Mare. This development has a number of highly sustainable features within the design that contributes to the overall performance of the building.
Read the case studyCowlyn Bay Community & Watersport Centre was the initial phase of a development plan aimed at revitalizing the Colwyn Bay seafront
Read the case studyThe £7.9 million indoor sports complex, delivered by Speller Metcalfe, has replaced the former sports dome and occupies the same footprint.
Read the case study10 Station Road is a new office block located in the heart of Cambridge, designed and constructed with sustainability as a core principle.
Read the case studyWe are supporting a major 5-10 year refurbishment to provide new facilities in the historic building meeting changing clinical and patient needs.
Read the case studyThe project involves a construction of a new hotel located in Exeter Science Park. The Net Zero Carbon hotel will include 142 bedrooms, restaurant space and bar with private dining, conference facilities and a gym, as well as electric vehicle and electric bike charging points.
Read the case studySet in the grounds of Warwick Castle, The Merlin Entertainments medieval themed Hotel meets modern standards but keeps to the 1,100 years of Warwick Castle’s authentic history.
Read the case studyThe University of Glasgow is set to construct the Keystone Building, a major new learning, teaching, and research facility with the aim of it becoming one of the largest net-zero-carbon University buildings in the UK.
Read the case studyThis project consisted of a local services and interior design fit-out. The project is London’s Biggest Craft Beer Venue and BrewDog’s biggest ever UK site in the heart of Sidings at Waterloo Station.
Read the case studyFor security reasons, we cannot publish specific details about our work with Defence Estates. However, we can confirm that we have provided support on a range of projects including offices, hangers, recreational facilities, storage and accommodation.
Read the case studySCS's work on the HMP Guys Marsh project extends to both the development of the new T60 houseblock (houseblock 1) and accompanying workshop located within an active Category C prison in Dorset.
Read the case studyFor security reasons, we cannot publish specific details about our work with the Ministry of Justice. However, we can confirm that we have provided support on a range of projects including secure facilities, training facilities, recreational facilities.
Read the case studyA major new hospital development including the construction of three new buildings and refurbishment of an existing building.
Read the case studyThe project consists of the construction of a new boarding house at Sevenoaks School Foundation.
Read the case studyThe project involved a refurbishment of an existing building to provide 18 rooms, bear lovers bars on the ground floor and rooftop.
Read the case studyThis project consists of a refurbishment of two existing buildings alongside a new-build construction to create a new Junior and Lower School with an aspiration to be net zero carbon in both construction and operational energy.
Read the case studyThe Other House Covent Garden will provide a signature club flats, rooftop bar, bistro, restaurant, gym and wellness centre in Covent Garden.
Read the case studyThe project consists in the construction of a new Institute of Medical Sciences (IMS) to train 3,000 students a year.
Read the case studyThe project consists of a new residential mixed-use development comprising 5 new construction buildings to provide 654 new homes
Read the case studyThis project consists of a mixed-use development in Wimbledon, London. The proposal includes 135 new homes with ground floor retail spaces.
Read the case studyWake The Tiger is an immersive art experience consisting of 27 different creative environments including artwork, installations, narrative, soundscape, secret passageways and so much more.
Read the case studySCS have been involved in the design an construction of two Guide Dogs facilities. One is located in Redbridge and the other one is in Tollgate.
Read the case studyThis project was a Green Apple Award Winner in 2012 achieving level 4 for the Code for Sustainable Homes, developed in partnership by Coastal Housing Group and the Welsh Assembly Government.
Read the case studyThe project involves a new water park for Chessington World of Adventures Resort.
Read the case study1210 Arlington Business Park is a major refurbishment and extension of a 4,500m2 office building in Reading.
Read the case studyWe will collaborate with the design team to incorporate strategies that will enable the High Commissioner's Residence building and staff accommodation in Abuja, Nigeria to achieve a BREEAM Excellent rating.
Read the case studySustainable Construction Services played a crucial role in the Department of Biological Science project at the University of Bristol, working with the team for over five years to achieve a BREEAM Excellent rating for the new building.
Read the case studyThis project involved the construction of two single storey buildings: a Community Centre and Sport Pavilion in Boorley Green, Hampshire.
Read the case studyThis was a major new redevelopment project for University Hospital Wales, updating their Major Trauma Vascular Hybrid Theatres funded by the Cardiff and Vale University Health Board.
Read the case studyThe project consists of the new construction office buildings in Temple Way, Bristol.
Read the case studyProject Norwood is a new 100,000 sq foot office block over 6 floor for the insurance company Zurich in Swindon.
Read the case studyCroes Atti Care Home with a total floor area of 4,000 sqm across four stories, will provide ensuite rooms for residents, multiple lounges, dinning rooms and other wellness facilities.
Read the case studySCS's work on HMP Maidstone included supporting the successful delivery of a new sports hall located within an operational category C prison.
Read the case studyThis new build health facility includes primary care, minor procedures, outpatient and many other health services.
Read the case studyThis project consisted in a new storage unit in Weston Super Mare. This development has a number of highly sustainable features within the design that contributes to the overall performance of the building.
Read the case studySancta Maria Hospital, located in Swansea provides primary healthcare facilities including Inpatient, Outpatients, Day Case Surgery, Radiology, MRI, and support areas.
Read the case studyThis project consists of a two storey building that provides practical plumbing and electrical work, plus flexible build spaces, testing areas, mobile workbenches, breakout and show case areas, and associated classrooms, offices and storage spaces.
Read the case studySCS were appointed by Cirencester College as the Sustainable Consultant to join the team at early stages.
Read the case studyAlconbury Weald Church Academy project compromise the construction of a new SEND School and a Secondary School in Huntingdon.
Read the case studyCowlyn Bay Community & Watersport Centre was the initial phase of a development plan aimed at revitalizing the Colwyn Bay seafront
Read the case studyThe mixed-used regeneration scheme features a range of retail, food and commercial uses, apartments and office units linked by a cosmopolitan mix of courtyard spaces.
Read the case studySCS is an award winning environmental & sustainability consultancy with over 15 years of experience simplifying sustainability requirements within the built environment. SCS provides services in Sustainability, Energy Modelling, Net Zero and more to clients and contractors in a wide range of industries, including education, government and industrial.