Based on heart of Manchester, the Doghouse hotel is one of the three Brewdog Hotels in the UK.
The project involved a refurbishment of an existing building to provide 18 rooms, bear lovers bars on the ground floor and rooftop.
SCS acted as BREEAM Assessor and BREEAM AP for the client.
Also SCS was involved during construction stage to support the main contractor in sustainable aspects such as Considerate Construction Scheme certification, environmental policies, etc.
Supporting Brewdog sustainability, SCS completed a Life Cycle Impact Assessment to assist with material selection to reduce their life cycle environmental impacts.
The building achieved a BREEAM Excellent with a score of 72.4%.
This performance was achieved despite a challenging constrains due the existing building and late consideration of BREEAM.