Yeates Removals Storage Unit, Weston-Super-Mare
This project consisted in a new storage unit in Weston Super Mare. This development has a number of highly sustainable features within the design that contributes to the overall performance of the building. These include, highly sustainable and certified building materials, low water use fittings and excellent on site management to keep waste produced to a minimum.
All these factors resulted in the development successfully achieving BREEAM Excellent rating.
SCS were appointed to provide a wider sustainability services which included:
- BREEAM Assessor
- BREEAM AP
- IMPACT Study
- Life Cycle Costing Report
- Chair of BREEAM focused waste and climate change workshops
- Thermal modelling
- Low Zero Carbon Assessment and Sustainability Statement for planning.
- Non-Domestic Energy Calculation: Part L compliance
Client: GH Yeates and Sons Ltd
Architect: TM Ventham
Contractor: Corkish Construction Ltd
Scheme: Industrial
Rating aim: BREEAM Excellent
Role: BREEAM Assessor & AP, Carbon assessors, Energy Modellers
DISCOVER MORE
Get In Touch
FOLLOW US
Sustainable Construction Services
Bristol Office:
First floor, A Block-West, Underfall Yard, Cumberland Rd, Bristol, BS1 6XG
London Office:
Wimbletech, Wimbledon Hill Road, London, SW19 7NB